Office move plan: eight weeks to the first morning

Who decides what, when to tell staff and clients, and how to be working again on the first morning.

By the Fralin Movers crew. 15 November 2026, 6 min read.

Crew unloading stacks of red crates from the truck

An office move goes well when one person owns it and everyone else knows the date. The lifting takes a day. The planning takes eight weeks, and it decides whether your team loses an hour or a week.

Eight weeks before

  • Name one move lead. One person who makes decisions and answers questions.
  • Fix the date. Evenings and weekends keep the working week whole.
  • Check both leases. Notice at the old office, handover terms, and the date you get keys to the new one.
  • Draw the floor plan. Where each team, desk, printer and cabinet goes in the new space.
  • Ask for quotes. Give each mover the same facts: number of workstations, floors, lifts and the two addresses.

Six weeks before

  • Talk to IT. Internet at the new office takes longest. Order it now. Decide who disconnects and reconnects computers, phones and servers.
  • Decide what is not coming. Old furniture, dead equipment and files past their keeping date. Sell, donate or shred.
  • Tell your staff the date, the new address and what they will be asked to do.

Four weeks before

  • Book the mover and confirm the date, the hours and the price in writing.
  • Talk to both buildings. Ask each management office about goods lift hours, the loading bay, gate passes for furniture leaving, and any cover they want on floors and lift walls.
  • Tell clients, suppliers, the bank and your service providers the new address and the date it takes effect.
  • Order what must be printed: signage, letterheads, business cards.

Two weeks before

  • Label everything. Each desk, cabinet and crate gets a label that matches a place on the new floor plan. Colour by department works well.
  • Crates arrive. Staff pack what they do not need daily.
  • Back up your data and test that the backup opens.
  • Collect keys and access cards for the new office.

The last week

  • Staff pack their desks and take personal items home.
  • IT shuts down and disconnects in an agreed order, and labels every cable.
  • Walk the route at both ends with the mover: doors, corridors, lifts, parking.
  • Hand the move lead a printed floor plan and a phone list.

Moving day

  1. The move lead stays at the old office until the last crate leaves, then goes to the new one.
  2. A second person stands at the new office and directs each load to its place.
  3. Furniture is rebuilt where the labels say.
  4. IT reconnects and tests the internet, phones and printers before anyone else arrives.

The first morning

  • A plan of the new floor at the door.
  • Crates unpacked, then stacked for collection.
  • A list for snags: what is missing, what does not work, who is fixing it.

What we do in this plan

We supply the crates, dismantle and rebuild the workstations, and move by department so every crate lands at the right desk. Evening and weekend moves are on request. See office moving and office prices.

Tell us where you are going.

Send the details on WhatsApp and get your quote.

Have these ready

  • House size
  • Moving from
  • Moving to
  • Moving date

The button opens WhatsApp with these lines waiting for your answers.

WhatsApp us